Line 02 of 05 · Hardscape

Hardscape Built Around the Property

Pavers, patios, walkways, retaining walls, steps, and outdoor spaces planned around how the property looks, drains, and functions.

BBB A+ Accredited Since 2017 19 Years in Business Est. 2007 Licensed & Insured Documentation on request Portland Metro Area & Clark County, WA Occupied-Property Work Homes, units, operations Masonry & Hardscape One exterior scope

More Than a Finished Surface

More Than aFinished Surface.

Good hardscape starts below what you can see. Base preparation, grading, drainage, material selection, transitions, and sequencing all affect how a patio, walkway, retaining wall, or paver system performs after the project is complete. EC approaches hardscape as part of the property, not as a collection of disconnected installations.

02 / HARDSCAPE
Paver patio with seating and a fire feature Detail 02

Patios, Pavers & Walkways

Patios, Pavers& Walkways

Outdoor surfaces should connect spaces naturally while standing up to everyday use and changing weather conditions.

  • 01 Paver patios
  • 02 Walkways and pathways
  • 03 Steps and transitions
  • 04 Outdoor gathering areas
  • 05 Paver replacement and upgrades
  • 06 Hardscape expansions
Tiered stone retaining wall with landscaped planting beds Detail 03

Retaining Walls & Site Features

Retaining Walls& Site Features

Retaining walls can solve grade changes, create usable space, define areas of a property, and support the overall function of an exterior space. We plan each project around the conditions of the site, including elevation, drainage, access, materials, and surrounding structures.

  • 01 Retaining walls
  • 02 Raised areas and site features
  • 03 Steps
  • 04 Grade transitions
  • 05 Structural hardscape elements
Curved stone garden wall and grade transition Detail 04

Grading & Drainage

Grading &Drainage

What happens to water matters just as much as what the finished project looks like. Grading and drainage are considered as part of the hardscape scope so patios, walls, walkways, and surrounding areas work together after installation.

Complete Outdoor Construction

One Contractor.One Plan.

Hardscape can also be integrated with masonry, stonework, pool areas, retaining walls, and other exterior construction when the project requires a broader scope. One contractor. One plan. Better coordination between each part of the project.

Masonry Stonework Pool Areas Retaining Walls
One Coordinated Scope

Line 02 · Hardscape

Planning aHardscape Project?

Tell us what you want to change about your outdoor space. We'll review the site, the scope, and the conditions that need to be addressed before construction begins.

971-715-8721